Project Archives

Nuclear Power Generation Stations — portable high pressure decontamination systems

Hydro Quebec Gentilly — 10,000 psi

Ontario Hydro, Pickering

  • 6 units — 10,000 psi
  • 2 units — 15,000 psi

Ontario Hydro, Darlington—2 units — 10,000 psi

Bruce Power, Tiverton

  • 3 units – 10,000 psi
  • 4 units – 2,000 psi

Atomic Energy Chalk River — 1 unit — 8,000 psi

Ontario Hydro Geotechnical — 1 unit — 20,000 psi

Industrial

CAMI Automotive, Ingersol — Paint Booth Maintenance, 2 electric pump systems, 11,000 psi, 200 H.P.

Ford Motor Co, Oakville — Paint Booth Maintenance, 2 electric pump systems, 11,000 psi, 200 H.P.

Canmet, Val d’Or, Quebec — Water Drilling, electric skid mounted pump systems, 3000 psi, 75 H.P.

Provincial Environmental — Hamilton Contract Cleaning, 10,000 psi, 300 H.P.

National Research Council, Ottawa, Research and development

  • Portable electric pump system, 10,000 psi, 40 H.P.
  • Portable electric pump system, 6,000 psi, 40 H.P.

Aecon Inc., Montreal — Diesel powered portable pump system, 10,000 psi, 100 H.P.

Mining

Hudson Bay Mine, Flin Flon, Manitoba — 2 Grout Plants, 2,000 psi, 20 H.P.

Noranda, Val d’Or, Quebec — 2 Grout Plants, 2000 psi, 20 H.P.

J.S. Redpath, North Bay, Ontario, Mining contractor — 16 Grout Plants, 2000 psi, 20 H.P.

Cementation, Sudbury, Ontario, Mining contractor — 2 Grout Plants, 2,000 psi, 20 H.P.

©2024 ConMICO Inc. All Rights Reserved.
140 Bradwick Drive, Unit 11, Concord, Ontario, Canada L4K 1K8
Tel: 905.660.7262 • Fax: 905.660.1843 • Email: Conmico.com

©2024 ConMICO Inc. All Rights Reserved. 140 Bradwick Drive, Unit 11, Concord, Ontario, Canada L4K 1K8
Tel: 905.660.7262 • Fax: 905.660.1843 • Email: Conmico.com