Recent Projects

Cameco, Cigar Lake Mine — Jet Boring System, 15,000 psi, 800 H.P.

Codelco, El Teniente Mine, Chile — Aqua-Frac, 10,000 psi, 350 H.P.

Codelco, El Teniente Mine, Chile — Aqua-Frac, 10,000 psi, 400 H.P.

Codelco, El Teniente Mine, Chile — Aqua-Frac, 10,000 psi, 700 H.P.

AMC Engineers, Esterhazy, Saskatchewan — High pressure grout plant, 2000 psi, 20 H.P

Multicrete Systems, Winnipeg, Manitoba — Hydraulic powered high pressure grout plant, 2000 psi, 20 H.P.

©2024 ConMICO Inc. All Rights Reserved.
140 Bradwick Drive, Unit 11, Concord, Ontario, Canada L4K 1K8
Tel: 905.660.7262 • Fax: 905.660.1843 • Email: Conmico.com

©2024 ConMICO Inc. All Rights Reserved. 140 Bradwick Drive, Unit 11, Concord, Ontario, Canada L4K 1K8
Tel: 905.660.7262 • Fax: 905.660.1843 • Email: Conmico.com